501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

j) Color prints of proposed graphics with a list of points for display<br />

E. Project Record Documents. Upon completion of installation submit three (3) copies of record (asbuilt)<br />

documents. The documents shall be submitted for approval prior to final completion and<br />

include:<br />

1.7 WARRANTY<br />

1. Project Record Drawings. These shall be as-built versions of the submittal shop drawings.<br />

One set of electronic media including CAD .DWG or .DXF drawing files shall also be<br />

provided.<br />

2. Testing and Commissioning Reports and Checklists.<br />

3. Operating and Maintenance (O & M) Manual. These shall be as-built versions of the<br />

submittal product data. In addition to that required for the submittals, the O & M manual<br />

shall include:<br />

a) Names, address and 24-hour telephone numbers of Contractors installing<br />

equipment, and the control systems and service representative of each.<br />

b) Provide on-line help for documenting operator instructions<br />

c) A listing and documentation of all custom software created using the programming<br />

language including the point database. One set of magnetic media containing files of<br />

the software and database shall also be provided.<br />

d) One set of electronic media containing files of all color-graphic screens created for<br />

the project.<br />

e) Complete original issue documentation, installation, and maintenance information for<br />

all third party hardware provided including computer equipment and sensors.<br />

f) Licenses and warranty documents for all equipment and systems.<br />

g) Recommended preventive maintenance procedures for all system components<br />

including a schedule of tasks, time between tasks, and task descriptions.<br />

A. Warrant all work as follows:<br />

1. Labor & materials for control system specified shall be warranted free from defects for a<br />

period of twelve (12) months after final completion acceptance by the Owner. Control<br />

System failures during the warranty period shall be adjusted, repaired, or replaced at no<br />

charge or reduction in service to the Owner. The Contractor shall respond to the Owner's<br />

request for warranty service within 24 hours during customary business hours. Include<br />

one (1) four hour on-site visit per quarter during the first year of warranty period to<br />

calibrate building automation system back to design. Review all new overrides and set<br />

point adjustments with end user.<br />

2. The system provider shall provide a web-accessible system and support on-line resource<br />

that provides the Owner access to a question/answer forum, graphics library, user tips,<br />

upgrades, and manufacturer training schedules.<br />

1.8 OWNERSHIP OF PROPRIETARY MATERIAL<br />

A. All project-developed hardware and software shall become the property of the Owner. These<br />

items include but are not limited to:<br />

1. Project graphic images<br />

2. Record drawings<br />

3. Project database<br />

DIRECT DIGITAL CONTROL SYSTEM 15900-4