04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9.1 ADDITIONAL SERVICES<br />

9.0 ADDITIONAL SERVICES AND LIMITATIONS<br />

Variations in soil types and conditions are possible and may be encountered during<br />

construction. To permit correlation between the soil data obtained during this<br />

investigation and the actual soil conditions encountered during construction, we<br />

recommend that Kleinfelder be retained to provide observation and testing services<br />

during site earthwork and foundation. This will allow us the opportunity to compare<br />

actual conditions exposed during construction with those encountered in our<br />

investigation and to provide supplemental recommendations if warranted by the<br />

exposed conditions. Earthwork should be performed in accordance with the<br />

recommendations presented in this report, or as recommended by Kleinfelder during<br />

construction.<br />

Kleinfelder should review geotechnical portions of the final plans and specifications to<br />

evaluate how the recommendations presented in this report were implemented into the<br />

designs. If Kleinfelder is not retained for these services, the client will assume our<br />

responsibility for any potential claims that may arise.<br />

9.2 LIMITATIONS<br />

We have prepared this report for <strong>TranSystems</strong> <strong>Corporation</strong> for use in the design of the<br />

proposed new Federal Express Security Screening Building project at 1 Sally Ride Way<br />

in Oakland, California. We prepared this report in substantial accordance with the<br />

generally accepted geotechnical engineering practice, as it exists in the project area at<br />

the time of our study. No warranty, express or implied, is made or intended. It is likely<br />

that soil conditions vary between or beyond the locations that we have explored to date.<br />

Land use, site conditions (both on-site and off-site) or other factors may change over<br />

time, and additional geotechnical exploration may be required if the construction plan or<br />

schedule changes.<br />

This report may be used only by <strong>TranSystems</strong> <strong>Corporation</strong> and their project consultants,<br />

only for the purposes stated, and within a reasonable time from its issuance. Any party<br />

other than <strong>TranSystems</strong> <strong>Corporation</strong> who wishes to use this report shall notify<br />

94240/1(OAK8R061)/es Page 25 of 29 June 13, 2008<br />

© 2008 Kleinfelder

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!