501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

Port and TSA. Please allow up to 60 days to receive an approval for any modification.<br />

F. The construction of the bridge linking the two buildings shall cross over a planned temporary fence<br />

separating the AOA from the non-AOA area. The Contractor shall coordinate what security<br />

measures the Port and TSA will require well in advance of the construction of the fence. Such<br />

security provisions shall be the sole responsibility of the contractor, financially or otherwise.<br />

1.7 FIRE PROTECTION<br />

A. The Contractor shall provide and maintain fire extinguishers and maintain existing fire<br />

hydrants if located within the construction limits; maintain fire lanes to hydrants and other<br />

equipment as necessary for proper fire protection during construction. Such equipment is to be<br />

used for fire protection only.<br />

1.8 REMOVAL OF TEMPORARY MATERIALS<br />

A. Completely remove temporary materials and equipment when their use is no longer required.<br />

B. Clean and repair damage caused by temporary installations or use of temporary facilities.<br />

C. Restore existing facilities used for temporary services to original condition.<br />

D. Dirt and excavated material shall be removed and disposed of to prevent accumulation.<br />

1.9 SITE ACCESS<br />

A. Access to any location within the Metroplex or any other location otherwise within the Airport<br />

Operations Area (AOA) by construction personnel shall be as agreed to by the Owner and Port of<br />

Oakland. Security requirements shall be maintained as required by the Owner and Port of<br />

Oakland.<br />

B. The Contractor shall provide all necessary approaches and exits to any staging areas and obtain<br />

necessary permits from the local authorities.<br />

C. In connection therewith, the Contractor shall make provision for temporary drainage and pumping<br />

as required, as the site must be kept free from standing water at all times.<br />

1.10 STORAGE AND PARKING<br />

A. Materials storage and location for typical temporary construction facilities such as trailers,<br />

equipment parking, and portable toilets shall be allowed only within the construction limits as<br />

shown on the project drawings, and only if first agreed upon by the <strong>Construction</strong> Manager and<br />

Owner who shall have the right to request the relocation of any such facilities if their operations<br />

stand to be impacted negatively. Such a relocation of equipment and or structures shall come at<br />

no additional cost to the Owner.<br />

B. No parking for the Contractor's employees’ personal vehicles is available on the site nor anywhere<br />

on Federal Express leased property.<br />

C. The contractor is asked to limit vehicles on site only to those service vehicles and machines that<br />

are actively being utilized for construction processes.<br />

TEMPORARY FACILITIES AND SERVICES 01050 - 4