501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1.16 WORKMANSHIP<br />

A. Work shall be installed only by mechanics skilled in the particular trade and licensed as may be<br />

required.<br />

1.17 EXISTING UTILITIES AND SERVICES<br />

A. Connect to existing utilities and services as indicated on the Drawings. Utilities and services have<br />

been located as accurately as possible; however, the exact location is not guaranteed. Prior to<br />

bidding, Contractor must inspect job site conditions and determine locations as required.<br />

Variations from locations indicated on the Drawings will not be basis for additional compensation.<br />

1.18 CARE AND PROTECTION OF ROOF SYSTEM<br />

A. The Sort Building roofing system is susceptible to damage caused by excessive heat, petroleum<br />

based oil contact and sharp objects. This system must be positively protected from sparks,<br />

flames, oils and mechanical abuse. Protect the roof system from damage during the course of this<br />

work that occurs on the roof surface.<br />

1.19 STANDARDIZATION<br />

A. All similar items of equipment shall be of the same manufacturer.<br />

1.20 PRODUCT DELIVERY HANDLING AND STORAGE<br />

A. Shipping, handling, and storage of products shall be in strict accordance with the manufacturer's<br />

recommendations regarding covering, unloading and storage in clean, dry areas.<br />

B. Items damaged in shipment or during handling, storage or erection will be rejected and must be<br />

replaced at no additional compensation to the Contractor.<br />

PART 2 - PRODUCTS<br />

2.1 AS-BUILT DRAWINGS<br />

A. Maintain two sets of Contract Documents; i.e., Drawings (including the Owner insuring agency<br />

approved Drawings), Specifications, addenda, modifications, and submittals at the site in good<br />

order, and annotated daily to show all changes made during the construction process. These<br />

Drawings shall be made available for review by the Engineer upon his request. At the conclusion<br />

of the project, verify the accuracy of these Drawings and stamp each Drawing "AS-BUILT" with a<br />

stamp indicating the Contractor's name, date, and signature of a principal of the company. Deliver<br />

one set to the Owner and one set to the Engineer.<br />

B. All uncovered, charted or not charted utilities shall be exactly located on the Record Drawings by<br />

dimensions from a column or suitable building wall. Verify all inverts. Deviations greater than 1/4<br />

inch shall be recorded.<br />

GENERAL PROVISIONS – MECHANICAL 15010-6