04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

SECTION 15040 – LEED REQUIREMENTS AND LEED POINTS CHECKLIST<br />

PART 1 - GENERAL<br />

The requirements of Section 15010 shall apply to this section, except as herein modified.<br />

1.1 SCOPE<br />

A. The Owner is pursuing a LEED qualified facility. This LEED-NC 2009 project checklist delineates<br />

the LEED points that are to be obtained for this project. This checklist will be made available to<br />

the contractor. This contractor shall include meeting the following delineated LEED points relative<br />

to Division 15 scope of work for this project. The contractor shall take the lead role (become the<br />

point champion) and participate in securing the respective Division 15 LEED points and provide all<br />

work necessary to meet the identified LED points for plumbing, mechanical, or the commissioning<br />

agent, where he is identified as the point champion.<br />

PART 2 - PRODUCTS<br />

PART 3 - EXECUTION<br />

3.1 LEED – NC 2009 Project Checklist<br />

END OF SECTION 15040<br />

LEED REQUIREMENTS AND LEED PIONTS CHECKLIST 15040-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!