501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1.7 JOB CONDITIONS<br />

3. Fluids (including refrigerants) lost during the warranty period shall be replaced without<br />

charge to the Owner.<br />

A. Prior to bidding, make a detailed field inspection and become familiarized with the locations and<br />

conditions affecting the work. Take field measurements, carefully inspect existing structure and<br />

piping to determine exact field conditions, points of tie-ins, access to work, and possible<br />

interference between existing work and the new work. Include in the bid items that are necessary<br />

to complete the work as shown on the Drawings and described herein.<br />

1.8 COMPLETENESS OF BIDS<br />

A. Include items that are necessary to complete the work as shown on the Drawings and described<br />

herein.<br />

B. Bidders are also expected to confer with the Owner’s Representative, prior to bidding, if there are<br />

any items shown on the plans or described herein that are not clearly understood. No allowance<br />

will be made by the Owner or Engineer for lack of information on the part of the Contractor after<br />

the bid is submitted and the Contract signed.<br />

C. Interpretations, corrections, and changes of the contract documents will be made by Addendum or<br />

otherwise in writing. Interpretations, corrections, and changes made in any other manner will not<br />

be binding and shall not be considered.<br />

1.9 SUBSTITUTION AND APPROVAL OF MATERIALS<br />

A. The Drawings and Specifications were developed using the products of one manufacturer as the<br />

BASIS OF DESIGN and for detailing. In the product description, this manufacturer is the FIRST<br />

name listed. Other acceptable manufacturers having similar products may then be listed as<br />

substitutions.<br />

B. The products described in the Specifications are intended to establish the standard of quality that<br />

the Engineer has determined as necessary for this project. Only products of the manufacturers<br />

listed may be provided, except as indicated in Section 01600, MATERIALS AND EQUIPMENT.<br />

Contractor shall assume responsibility for and include in bid all additional costs caused by<br />

installation and dimensional changes that result from use of products other than those that served<br />

as the BASIS OF DESIGN. This includes all changes to pumps, motors, wiring, controls, piping,<br />

structural revisions, and coordination with other trades. All products shall meet space limitations.<br />

1.10 CUTTING AND PATCHING<br />

A. Cut and patch penetrations required by this Specification. Patching shall match adjoining surface<br />

in both material and quality. Patching shall be done only by craftsmen skilled in the respective<br />

trade. This includes patching of blacktopped areas. Sealing of all roof penetrations shall be under<br />

another Contract or Division. Concrete slab shall be cut and patched under Division 3. Cutting of<br />

concrete or masonry walls shall be core drilled to prevent spalling. All procedures shall be<br />

carefully coordinated with Owner's Representative.<br />

GENERAL PROVISIONS – MECHANICAL 15010-4