501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Drainage lines shall be properly vented, graded, and trapped to conform to local and state<br />

requirements.<br />

B. Each fixture shall be vented and trapped. Each vent shall be extended through the roof. Where<br />

one vertical vent line connects to another, an inverted "Y" fitting shall be used.<br />

C. Floor drain elevation shall be set to a tolerance of +0", -1/8".<br />

D. Horizontal soil and waste lines within the building shall be graded 1/4" per foot unless otherwise<br />

noted on the Drawings. Horizontal soil and waste lines outside the building shall be graded in<br />

accordance with the inverts shown on the Drawings.<br />

D. Changes in direction shall be made with "Y" fittings, combination "Y" and eighth bends or one<br />

eighth bends. Offsets in soil and waste pipes shall not be permitted when they can be avoided.<br />

Offsets shall be made with 45 degree bends or similar fittings.<br />

E. Cleanouts shall be provided in Soil and Waste piping where shown on the Drawings at the ends of<br />

all mains, at intersection of branches with mains, at the base of vertical stacks, at intermediate<br />

points of long runs so as not to exceed 40 feet between cleanouts, and at other points required by<br />

applicable codes so that all piping is accessible throughout.<br />

F. Rough-in and make final connections to all equipment as noted in the Drawings. Verify all<br />

locations for roughing-in with the equipment supplier prior to beginning work.<br />

G. Products shall be protected after installation until construction is completed and accepted by the<br />

Owner. When ready for use, the Contractor shall remove all protection and place the equipment in<br />

operation.<br />

H. The Contractor shall be responsible for products until acceptance by the Owner.<br />

I. All products shall be installed square, in line and level to give a workmanlike and uniform<br />

appearance.<br />

J. The Plumbing Contractor shall be present during all concrete pours where floor drains, cleanouts,<br />

and other items requiring elevation alignment occurs. The Plumbing Contractor shall adjust the<br />

finish elevation of these items at this time.<br />

K. Exposed vertical piping shall be installed perfectly plumb.<br />

L. Refer to Section 15050, BASIC MATERIALS AND METHODS.<br />

3.2 TESTING<br />

A. Piping shall be tested in accordance with Specification Section 15425, PIPING TESTS.<br />