501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

I. Report results of tests and inspections in writing. Record adjustable relay settings and measured<br />

insulation resistances, time delays, and other values and observations. Attach a label or tag to each<br />

tested component indicating satisfactory completion of tests.<br />

J. Following completion of tests, refill fuel tanks and top off all engine fluids.<br />

3.3 DEMONSTRATION<br />

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust,<br />

operate, and maintain packaged engine generators.<br />

3.4 MAINTENANCE SERVICE<br />

A. Initial Maintenance Service: Beginning at substantial completion, provide 12 months’ full maintenance by<br />

skilled employees of manufacturer’s designated service organization. Include routine preventative<br />

maintenance as recommended by manufacturer and adjusting for proper operation. Provide parts and<br />

supplies same as those used in the manufacture and installation of original equipment.<br />

3.5 SPARE PARTS<br />

A. Furnish spare parts described below that match products installed and that are packaged with protective<br />

covering for storage and identified with labels describing contents.<br />

1. Fuses: Minimum of three for each type of fuse used<br />

2. Indicator lamps: Minimum of ten for each type of lamp used<br />

3. Filters: One set of lubricating oil, fuel and combustion-air filters for each type of engine.<br />

END OF SECTION 16460<br />

PACKAGED LIFE SAFETY ENGINE GENERATORS 16460 - 9