501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1.5 CLEANING<br />

g. Principal subcontractors' field and home offices.<br />

3. Provide superintendent with cellular telephone or portable two-way radio for use when<br />

away from field office.<br />

A. Execute cleaning during progress of the Work, and at completion of the Work. If the Contractor<br />

fails to keep the project clean, as herein specified, the Owner shall do the cleaning, the cost of<br />

which shall be charged to the Contractor.<br />

B. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations and antipollution<br />

laws.<br />

C. Execute daily cleaning to keep the Work, the Site and adjacent properties free from accumulations<br />

of waste materials, rubbish and windblown debris resulting from construction operations.<br />

D. Provide on-site containers for the collection of waste materials, debris and rubbish.<br />

E. Remove waste demolition materials, debris and rubbish from the site daily and dispose of it at<br />

legal disposal areas away from the site.<br />

F. Before Contract Closeout all construction tools, scaffolding, equipment and machinery shall be<br />

removed from the site.<br />

G. Remove from job daily debris which might contribute to survival or spread of rodents, roaches and<br />

other household pests.<br />

1.6 FENCES AND BARRICADES<br />

A. The Contractor shall construct and maintain temporary signs, walks, railings, fences, barricades<br />

and bulkheads as required by operations under this contract for safety of the public and for<br />

protection of the Work and as approved by Federal, State, and Municipal safety laws and building<br />

codes. Steel cover plates shall be installed over excavations in traffic areas. See drawings for<br />

additional information.<br />

B. All temporary signs, walks, barricades, fences, bulkheads, etc., shall be maintained in good<br />

condition throughout the term of the work, and at completion of the work they shall be removed<br />

and all work damaged thereby shall be repaired and replaced in good condition.<br />

C. The Contractor shall provide and maintain adequate warning signs and danger lights for the<br />

protection of the public. Danger lights shall be kept lighted each night from sundown to sunrise.<br />

D. The Contractor shall be responsible for coordinating all temporary barricade and safety issues with<br />

the Port directly. As necessary, special attention shall be paid to the placement of lit low profile<br />

barricades along the taxiway edge. These shall be in operation and in place at all times for all work<br />

prior to the completion of any work directly adjacent to an active taxiway.<br />

E. This project shall include the modification of existing AOA fences which are controlled by the Port<br />

of Oakland and the Transportation Security Administration (TSA). The contractor shall modify said<br />

fence boundaries as described in the plans, and shall be responsible for coordinating all such<br />

modifications with the Port and the TSA. All fence modifications must be approved in writing by the<br />

TEMPORARY FACILITIES AND SERVICES 01050 - 3