501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

6. Located on the face of the circuit breaker shall be indicators to show the position of the circuit breaker<br />

contacts, status of the closing springs, and circuit breaker position in the cell. An indicator shall show<br />

“charged – not OK to close” if closing springs are charged but circuit breaker is not ready to close.<br />

Circuit breaker racking system must have positive stops at the connected, test, disconnected and<br />

withdrawn positions.<br />

7. Secondary wiring shall be front accessible.<br />

8. Circuit breakers shall provide long service life. The 4000 A frames must be certified to 5000 operations<br />

without maintenance.<br />

9. Circuit breaker trip system shall be an electronic trip unit with functions of adjustable long-time pickup<br />

and delay, short-time pickup and delay, instantaneous, and ground-fault pickup and delay. Trip unit<br />

shall be true RMS current sensing.<br />

10. Electronic trip unit shall be UL Listed and field replaceable.<br />

11. Electronic trip units shall have internal metering capability.<br />

12. Electronic trip units shall have network communications ability for remote monitoring and configuration<br />

13. The main and tie breakers shall be of the same type and rating and shall be interchangeable<br />

D. Secondary Feeder Circuit Breakers<br />

1. All protective secondary devices shall be molded case circuit breakers.<br />

2. All breakers shall be UL listed for application in their intended enclosures.<br />

3. Where indicated on the drawings, circuit breaker trip system shall be an electronic trip unit with<br />

functions of adjustable long-time pickup and delay, short-time pickup and delay, instantaneous, and<br />

ground-fault pickup and delay. Trip unit shall be true RMS current sensing.<br />

2.6 METERING<br />

A. Multifunction Digital Metering Monitor: Eaton Xpert 2270 series meter, or Square D Powerlogic PM820 series<br />

meter, or equivalent by General Electric. Supply with all accessories needed for a fully functional networkconnected<br />

installation.<br />

2.7 INSTRUMENT TRANSFORMERS<br />

A. Provide all potential (voltage) transformers and current transformers as needed for metering as indicated in<br />

the contract documents.<br />

1. All current transformers shall be wired through shorting-type terminal blocks. All current transformer<br />

current loop terminations shall be made with ring-type terminations.<br />

2. Burden and accuracy of all instrument transformers shall be consistent will all connected devices.<br />

12 KV – 480/277V SECONDARY DOUBLE-ENDED UNIT SUBSTATIONS 16371-7