04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

3.4 DAMAGED MATERIALS<br />

A. Repair or replace damaged materials to the satisfaction of the Architect and/or owner. The cost of<br />

repairing or replacing damaged material will be charged to the responsible party.<br />

3.5 CLEANING AND CARE<br />

A. After completing panel installation, strip interior protective film if so instructed by Architect and/or owner.<br />

Panel surface shall be free of deleterious material including dirt.<br />

B. Wipe finished surfaces of filings caused by drilling or cutting to prevent any discoloration or rust stains<br />

resulting from the installation process.<br />

END OF SECTION 07413<br />

INSULATED-CORE METAL WALL PANELS 07413 - 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!