501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

A. At Contractor’s expense, provide temporary facilities as required for the project completion, including but<br />

not limited to:<br />

1. Temporary construction wiring, including outlets for lighting and power tools for all trades.<br />

2. Temporary openings in construction to facilitate entrance of equipment<br />

3. Temporary roadways, stairs, ladders, ramps and hoists, as required.<br />

4. Other temporary items specified elsewhere, and as indicated.<br />

B. Prior to final project acceptance, remove all temporary facilities unless otherwise approved.<br />

1.24 CONTINUITY OF SERVICES AND EXISTING OPERATIONS<br />

A. Arrange all work to interfere as little as possible with the normal existing operations. Do not interrupt any<br />

existing utility or other service or existing operation at anytime without Owner’s prior approval. After each<br />

interruption has been made, make all necessary connections and alterations, and restore services and<br />

avoid interferences with normal existing operations as quickly as possible.<br />

B. At no additional cost to Owner, provide all necessary temporary connections and temporary facilities to<br />

accomplish the required continuity of services and existing operations.<br />

1.25 SALVAGED MATERIALS AND EQUIPMENT<br />

A. Promptly haul away from the Owner’s premises all materials and equipment which are removed from the<br />

existing construction and are neither indicated nor required to be reused in the completed project,<br />

EXCEPT as otherwise specified below.<br />

B. The Owner may select certain removed existing materials and equipment and retain them for his future<br />

use. BEFORE removing any existing materials and equipment, determine from the Owner which of these<br />

materials and equipment (if any) he desires to retain. Remove all Owner-selected materials and<br />

equipment without unnecessary damage thereto, and safely store them at locations designated by the<br />

Owner.<br />

C. All waste or recycle materials shall be removed from the site in accordance with the City of Oakland’s<br />

Waste Reduction and Recycling Program. Refer to Section 00702 for more information.<br />

1.26 CONTRACTOR’S MARKUP<br />

A. Value of work added or omitted, and all changes, shall be fixed by fair adjustment and added to or<br />

deducted from contract price accordingly. Contractor shall be entitled to compensation only for work<br />

actually done, and Owner shall not be liable to contractor for damages or loss of anticipated profits<br />

occasioned by addition, omissions, or other alterations in work. Total percent of overhead and profit<br />

(OH&P) shall not exceed the following, unless stated otherwise in the final executed construction contract:<br />

1. Change orders involving Contractor’s work only: 10% total OH&P mark-up.<br />

2. Change orders involving Subcontractors and Contractor work: The firm(s) doing the work shall be<br />

entitled to a 10% OH&P mark-up. The Contractor shall be entitled to a 5% OH&P mark-up on the<br />

Subcontractor’s work.<br />

SPECIAL CONDITIONS OF CONTRACT 00711 - 8