501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1.3 SUBSTITUTIONS<br />

A. Substitutions are proposals from the Contractor which utilize other than named products which are equal<br />

or superior in all respects to that specified and provide a warranty at least equal to that specified.<br />

Substitutions will be permitted only when a product is named and "or equal" is indicated.<br />

B. Where substitutions are permitted, the Contractor shall waive all claims for additional costs related to the<br />

substitution and the Contractor will coordinate the installation of the substitution, making such changes as<br />

may be required for the Work to be complete in all respects with all applicable contractors and<br />

subcontractors on the project. A formal presentation of all proposed substitutions shall be submitted by<br />

the Contractor to the <strong>Construction</strong> Manager and Architect / Engineer for review within 20 calendar days of<br />

the date of commencement.<br />

C. Proposed substitutions which, upon evaluation are not approved by the Architect / Engineer shall not be<br />

permitted.<br />

1.4 PROHIBITED MATERIALS<br />

A. All materials shall comply with all applicable safety, health and environmental standards. All products<br />

containing asbestos are prohibited. Notify the <strong>Construction</strong> Manager if a specified product contains<br />

asbestos so that appropriate action can be determined.<br />

END OF SECTION 01600<br />