501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

2. Installation:<br />

permanently in place. The “chair” portion of the assembly shall be sloped at the thickened<br />

edges and shall be delivered pre-manufactured with a slope designed to keep the dowel<br />

bars at a uniform depth from the top of the slab. The dowel or load-transfer and joint<br />

devices shall be rigid enough to permit complete assembly as a unit ready to be lifted and<br />

placed into position. A metal, or other type, dowel expansion cap or sleeve shall be<br />

furnished for each dowel bar used with expansion joints. These caps shall be substantial<br />

enough to prevent collapse and shall be placed on the ends of the dowels as shown on the<br />

plans. The caps or sleeves shall fit the dowel bar tightly and the closed end shall be<br />

watertight. The portion of each dowel painted with rust preventive paint, as required in this<br />

specification, shall be thoroughly coated with asphalt MC-70, or an approved lubricant, to<br />

prevent the concrete from binding to that portion of the dowel. If free-sliding plastic-coated<br />

or steel dowels are used, a lubrication bond breaker shall be used except when approved<br />

pullout tests indicate it is not necessary.<br />

a. The top of an assembled joint device shall be set at the proper distance below the<br />

pavement surface and the elevation shall be checked. Such devices shall be set to the<br />

required position and line and shall be securely held in place by stakes or other means<br />

during the pouring and finishing of the concrete. The premolded joint material shall be<br />

placed and held in a vertical position; if constructed in sections, there shall be no offsets<br />

between adjacent units. Dowel bars shall be checked for exact position and alignment as<br />

soon as the joint device is staked in place, and the device shall be tested to determine<br />

whether it is firmly supported. The maximum permissible tolerance on dowel bar alignment<br />

in each plane, horizontal and vertical, shall not exceed 2 percent or ¼ inch (6mm) per foot<br />

of a dowel bar. The most effective way to obtain proper alignment is with well-fabricated<br />

dowel baskets and dowel assemblies.<br />

b. All joints in concrete pavements shall be sawed and beveled; the joints shall be cut as<br />

shown on the plans. Equipment shall be as described in this specification. The circular<br />

cutter shall be capable of cutting a groove in a straight line and shall produce a slot at least<br />

1/8 inch wide and to the depth shown on the plans. When shown on the plans or required<br />

by the specifications, the top portion of the slot or groove shall be widened by means of a<br />

second shallower cut to provide adequate space for joint sealers. When shown on the plans<br />

or required by the specifications, the top portion of the joint shall be beveled by a third cut.<br />

Sawing of the joints shall commence as soon as the concrete has hardened sufficiently to<br />

permit cutting without chipping, spalling, or tearing. Sawing shall be carried on both during<br />

the day and night as required. The joints shall be sawed at the required spacing<br />

consecutively in sequence of the concrete placement, unless otherwise approved by the<br />

Engineer.<br />

3. Longitudinal Joints:<br />

a. <strong>Construction</strong>: Longitudinal construction joints necessary for lane construction shall be<br />

formed against suitable side forms (made of steel) without keyways, as indicated in the<br />

plans. When the concrete is placed using slip-form pavers, dowels or tie bars shall be as<br />

shown on the drawings. Where butt-type joints with dowels are designated, the dowels for<br />

this type shall be painted and greased. The edges of the joint shall be finished with a<br />

grooving tool or edging tool. <strong>Construction</strong> joints shall be sawed to provide a groove at the<br />

top conforming to the details and dimensions indicated on the plans. Provisions shall be<br />

made for the installation of tie bars as noted on the plans. Dowels or tie bars shall be<br />

installed in a manner that does not damage the concrete. Dowels or tie bars shall be<br />

CEMENT CONCRETE PAVEMENT 02751 - 8