501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

J. Side Slopes: Embankment side slopes shall not exceed 2 horizontal to 1 vertical.<br />

3.5 WET CONDITIONS/WET WEATHER CONSTRUCTION CONSIDERATION:<br />

A. Where wet or yielding subgrade conditions are encountered, those conditions shall be corrected<br />

through excavation and replacement or through cement or lime-treating.<br />

1. Excavation and Replacement: Overexcavate soft, yielding area to limits directed by Engineer.<br />

Place geotextile fabric and backfill the area with a more select material such as Class 2 aggregate<br />

base meeting Caltrans specifications.<br />

2. Cement or Lime-Treating: Selection of the appropriate additive and amount of additive required<br />

shall be determined at the time of construction and may vary based on conditions noted.<br />

Contractor shall submit to Engineer the proposed additive, as well as mixing, proportioning,<br />

compaction and procedural method for Engineer’s review prior to subgrade stabilization activities.<br />

Mixing of additive into soil shall be by mechanical means. For bidding purposes, assume 5 percent<br />

cement additive (by weight) and treatment to a depth of 12 inches. The unit price provided shall<br />

include all materials, labor and equipment required to spread, and mechanically mix the additive<br />

into the soil and compacting to the required compaction levels.<br />

3.6 FIELD QUALITY CONTROL<br />

A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform<br />

field tests and inspections and to prepare test reports.<br />

B. Allow testing agency to test and inspect subgrades and each fill or backfill layer. Proceed with<br />

subsequent earthwork only after test results for previously completed work comply with requirements.<br />

C. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction<br />

specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and<br />

retest until specified compaction is obtained.<br />

3.7 CEMENT TREATED BASE<br />

A. Refer to Section 02239, Cement Modification of Soil.<br />

3.8 PROTECTION AND DISPOSAL<br />

A. Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.<br />

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces<br />

become eroded, rutted, settled, or where they lose compaction.<br />

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with<br />

additional soil material, compact, and reconstruct surfacing.<br />

EARTHWORK 02300 - 5