501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

The contractor shall be required to post such a guard at the gate at all times when intermittent or<br />

occasional entrances/exits are possible. The costs associated with these services shall be included in the<br />

bid. The contractor is responsible for contacting each security agency to determine pricing on an hourly<br />

basis to be used for the bid.<br />

1.9 CONSTRUCTION VEHICLE ACCESS TO AIRPORT FACILITIES<br />

A. The Contractor shall obtain construction vehicle passes for access to the ramp area by submitting a<br />

completed Request for Vehicle Ramp Passes (Exhibit C this Section).<br />

1. Vehicle Ramp Passes will be authorized by Federal Express on a need to enter basis.<br />

a. Apply for passes a minimum of seven days before beginning Work on the Site.<br />

b. Vehicles without authorized Passes will not be allowed entry to the Site.<br />

2. Unless otherwise authorized, the Contractor and each subcontractor will be permitted no more than<br />

one (1) vehicle per trade. Each vehicle shall be:<br />

a. Owned or hired by the Contractor or its subcontractor(s).<br />

b. Covered by Contractor’s insurance.<br />

c. On a pre-approved list.<br />

d. Identified (marked) in accordance with airport regulations and the requirements of this<br />

Section, and the requirements of the Port.<br />

3. Vehicle Ramp Passes will be issued for the duration of the Contractor's insurance certificate and<br />

will be renewed if required, pending submittal of required documentation. Monitor expiration dates<br />

and submit documentation in a timely manner.<br />

4. Vehicle Ramp Passes remain the property of Federal Express and shall be surrendered to Federal<br />

Express upon request, expiration, or completion of the Work (prior to final payment).<br />

5. Visibly display Vehicle Ramp Passes on the left dash of the vehicle. Drivers shall stop at the<br />

construction guard gate for clearance and verification<br />

a. Accuracy of information on the Vehicle Ramp Pass will be verified by Federal Express’<br />

security staff.<br />

6. Altered Vehicle Ramp Passes will be confiscated and the vehicle will not be allowed entry to<br />

Federal Express’ property.<br />

B. Vehicle Identification (Markings) - Passenger type vehicles, including pickup trucks: display the company<br />

name on each front door of the vehicle. The company name shall be readable at a distance of no less<br />

than 250 feet.<br />

1. Specialized equipment such as bulldozers, cranes, etc. will be exempt from this requirement.<br />

C. Ramp Escort Requirements - Provide a ramp escort for each vehicle that is not marked in accordance with<br />

the requirements of this section and not driven by a trained individual with worker identification in<br />

accordance with this section.<br />

SAFETY AND SECURITY REQUIREMENTS 01112 - 7