501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

4) VOC: 0 gm/L.<br />

5) Solids minimum: 30%<br />

E. Clear, Waterborne Curing and Sealing Compound:<br />

1. Exposed interior concrete slabs in Restrooms, Locker rooms, Janitor’s Closets and Kennels:<br />

Solvent free, two component, moisture insensitive, ultra low viscosity epoxy penetrating sealer<br />

complying with ASTM C 1315, Type 1, Class A.<br />

a. Product: Dural ® 335 as manufactured by Euclid Chemical Company unless otherwise<br />

indicated.<br />

2.6 RELATED MATERIALS<br />

A. Expansion- and Isolation-Joint-Filler Strips: Ceramar by W.R. Meadows or Ethafoam by Dow Chemical.<br />

2.7 CONCRETE MIXTURES<br />

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory<br />

trial mixture or field test data, or both, according to ACI 301.<br />

B. Proportion normal-weight concrete mixture as follows:<br />

1. Minimum Compressive Strength: 4000 psi (27.6 MPa) at 28 days.<br />

2. Slump Limit: [ 4 inches (100 mm), plus or minus 1 inch (25 mm) .<br />

3. Air Content: Do not allow air content of troweled finished floors to exceed 3 percent.<br />

C. Proportion structural lightweight concrete mixture as follows:<br />

1. Minimum Compressive Strength: 4000 psi at 28 days.<br />

2. Calculated Equilibrium Unit Weight: 110 lb/cu. ft. as determined by ASTM C 567.<br />

3. Slump Limit: 4 inches, plus or minus 1 inch<br />

4. Air Content: 6 percent, plus or minus 2 percent at point of delivery for nominal maximum<br />

aggregate size greater than 3/8 inch<br />

5. Air Content: 7 percent, plus or minus 2 percent at point of delivery for nominal maximum<br />

aggregate size 3/8 inch or less.<br />

6. Air Content: Do not allow air content of trowel-finished floors to exceed 3 percent.<br />

2.8 FABRICATING REINFORCEMENT<br />

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."<br />

2.9 CONCRETE MIXING<br />

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M [and<br />

ASTM C 1116], and furnish batch ticket information.<br />

CAST-IN-PLACE CONCRETE 03300 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!