501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

advised. Otherwise, the Contractor shall be held to the most stringent requirement at the<br />

discretion of the Engineer.<br />

D. When referenced codes, standards, or guidelines are in conflict, the most stringent shall govern.<br />

E. This Contractor shall coordinate his work with that of Division 2 such that the hydraulic calculations<br />

will integrate that work provided under Division 2. Extend hydraulic calculations to a point of<br />

known water test (pressure and flow).<br />

1.4 RELATED WORK<br />

A. Underground fire water systems shall be provided under Division 2.<br />

B. Refer to section 15050 Basic Materials and Methods.<br />

1.5 QUALITY ASSURANCE<br />

A. Installation of the fire protection work under this Section shall be in accordance to the<br />

requirements of UL, NEC, NFPA Standards including but not limited to NFPA-13, FM Loss<br />

Prevention Data, the 2006 International codes, and other applicable state and local codes,<br />

ordinances, restrictions, state and local fire departments requirements, OSHA, public utilities<br />

having jurisdiction, and the Owner's insuring agency requirements and any interpretation and<br />

formal positions of the Owner’s insuring agency. Where specific editions are not identified, the<br />

edition adopted at the time bids are received shall prevail.<br />

B. Refer to Part 3 - Execution, "Installation Requirements and Approvals."<br />

1.6 SUBMITTALS<br />

A. Submittals and the Contractor's working Drawings shall be completed and forwarded to the<br />

Engineer for review prior to the Fire Protection Contractor's first application for payment.<br />

B. The Contractor shall secure the services of a licensed professional fire protection engineer<br />

registered in the State of California who shall prepare, sign, and seal all drawing and calculation<br />

submissions. The Contractor shall make complete calculations and engineering drawings,<br />

including hydraulic reference points, to a scale of 1/8" = 1'-0" for overall plan drawings. Details,<br />

etc. shall be at a larger scale, minimum 3/8" = 1'-0". The maximum drawing size shall be 30" x<br />

42". The drawings and hydraulic calculations shall be submitted to, and approved by, the following<br />

agencies:<br />

1. F.M. Global<br />

Mr. Ryan Nichols<br />

100 Pringle Avenue<br />

Suite 400<br />

Walnut Creek, CA 94596<br />

Ph – 925-849-5061<br />

C – 805-801-9306<br />

Email – ryan.nichols@fmglobal.com<br />

2. State and Local Governing Authorities<br />

FIRE PROTECTION 15550-2