04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

4. Hooks: Four.<br />

5. Mop/Broom Holders: Three, spring-loaded, rubber hat, cam type.<br />

6. Material and Finish: Stainless steel, No. 4 finish (satin).<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

a. Shelf: Not less than nominal 0.05-inch- (1.3-mm-) thick stainless steel.<br />

A. Install accessories according to manufacturers' written instructions, using fasteners appropriate to<br />

substrate indicated and recommended by unit manufacturer. Install units level, plumb, and firmly<br />

anchored in locations and at heights indicated.<br />

B. Install Owner-Furnished, Contractor-Installed accessories according to manufacturers' written instructions,<br />

using fasteners appropriate to substrate indicated and recommended by unit manufacturer unless<br />

otherwise directed by Owner. Install in locations indicated. Install units level, plumb, and firmly anchored in<br />

locations and at heights indicated.<br />

END OF SECTION 10801<br />

TOILET ACCESSORIES 10801 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!