501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

A. Install six inch wide underground warning tape located one foot above buried utilities that identifies the<br />

utility.<br />

B. Concrete encasements around high voltage underground electric wires shall contain a red dye in the<br />

concrete.<br />

C. Provide record drawings of utilities in accordance with Section 00711. Each drawing shall bear the seal of<br />

a Civil Engineer or Land Surveyor registered in the State of California. As a minimum, the drawing shall<br />

include the following information:<br />

1. A chart with the following information on each marker:<br />

a. Marker number.<br />

b. Grid coordinates.<br />

c. Service (i.e. gas, water…)<br />

d. Pipe/wire size.<br />

e. Type of pipe installed (i.e. Schedule 40 steel with coating)<br />

f. Depth of burial.<br />

2. A scaled drawing of the utilities with the survey grid on the drawing. The depth of the utilities shall<br />

be provided on the drawings at a maximum of 100-foot intervals, changes in direction and when<br />

pipes pass under surface obstacles.<br />

3. Reference marks or locations.<br />

3.3 UNDERGROUND UTILITY MARKERS<br />

A. Provide permanent markers for new underground utilities at the following locations, as a minimum:<br />

1. Within two feet of each side of obstacles or walls.<br />

2. Changes in direction.<br />

3. Within two feet of each connecting pipes at branch line connections.<br />

4. Spaced maximum 300 feet along straight runs.<br />

5. Within two feet of the beginning/end of pipe.<br />

B. Markers shall contain information in accordance with details 9 and 10 on sheet CS503.<br />

C. Install markers in accordance with details 7 and 8 on CS503.<br />

D. Coordinates of utility markers shall be determined by a field survey. The survey shall be accurate within<br />

1/10,000 of a mile and shall be referenced to the California State Plane coordinates.<br />

E. Submit one (1) copy of the survey traverses used to determine coordinates of the markers.<br />

UNDERGROUND UTILITY IDENTIFICATION 02605 - 2