501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

A. The <strong>Construction</strong> Manager will pay for initial testing services, except where the provision of initial<br />

testing services is indicated as the Contractor's responsibility.<br />

B. If initial tests indicate non-compliance of an item with Contract documents, the cost of initial tests<br />

associated with that item's noncompliance will be deducted from the Contract Sum.<br />

C. Retesting: When initial tests indicate non-compliance with the Contract Documents, all subsequent<br />

retesting occasioned by the non-compliance shall be performed by the same testing agency and<br />

the costs thereof will be deducted from the Contract Sum.<br />

1.5 CODE COMPLIANCE TESTING<br />

A. Inspections and tests required by codes or ordinances, or by a plan approval authority, and which<br />

are made by a legally constituted authority, shall be the responsibility of and shall be paid for by the<br />

Contractor, unless otherwise provided in the Contract Documents.<br />

1.6 CONTRACTOR'S CONVENIENCE TESTING<br />

A. Inspecting and testing performed exclusively for the Contractor's convenience shall be the sole<br />

responsibility of the Contractor.<br />

1.7 INSPECTION BY CONSTRUCTION MANAGER’S OR OWNER'S PERSONNEL<br />

A. From time to time, personnel in the employ of the <strong>Construction</strong> Manager or Owner may inspect the<br />

work where the work is in progress, but shall have no authority to direct the Contractor or request<br />

changes in the work except through the <strong>Construction</strong> Manager.<br />

1.8 COOPERATION WITH TESTING LABORATORY<br />

A. Representatives of the testing laboratory shall have access to the work at all times. Provide<br />

facilities for such access in order that the laboratory may properly perform its function.<br />

1.9 TAKING SPECIMENS<br />

A. Specimens and samples for testing, unless otherwise provided in the Contract Documents, will be<br />

taken by the testing personnel. Sampling equipment and personnel will be provided by the testing<br />

laboratory. Deliveries of specimens and samples to the testing laboratory will be performed by the<br />

testing laboratory.<br />

1.10 SCHEDULES FOR TESTING<br />

A. Establishing the schedule:<br />

1. By advance discussion with the testing laboratory,, determine the time required for the<br />

laboratory to perform its tests and to issue each of its findings.<br />

2. Provide required time within the construction schedule.<br />

3. Revising the schedule: When changes of construction schedule are necessary during<br />

construction, coordinate such changes of schedule with the testing laboratory as required.<br />

TESTING LABORATORY SERVICES 01075 - 2