501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

Project Manager shall be authorized by the Contractor to act on its behalf in every matter relating<br />

to the Work.<br />

2.2 CONTRACTOR’S SAFETY REPRESENTATIVE<br />

A. The Contractor shall assign a Safety Representative to coordinate the safety precautions taken by<br />

the Contractor in its performance of the Work.<br />

PART 3 - CORRECTION OF DEFICIENCIES<br />

3.1 DEFINITIONS AND APPLICATIONS<br />

A. “Deficiency” is a condition or characteristic in supplies or services furnished by the Contractor that<br />

is not in compliance with the requirements of the Contract Documents. “Correction” means the<br />

actions taken by the Contractor that are necessary to eliminate a deficiency.<br />

B. The rights and remedies of Federal Express will not be affected in any way by any other provisions under<br />

the Contract Documents concerning the conclusiveness of inspection and acceptance; and are in addition<br />

to and do not limit, any rights afforded to Federal Express by any other Section of the Contract<br />

Documents.<br />

C. This Article applies only to deficiencies discovered during performance of the Work and within one year<br />

from the date of Final Acceptance except where otherwise noted.<br />

D. The Contractor shall not be responsible for the correction of deficiencies in property furnished by Federal<br />

Express unless the Contractor performs or is obligated to perform modifications or other work on such<br />

property. In that event, the Contractor shall be responsible for correction of deficiencies to the extent of<br />

such modifications other work. The Contractor shall not be responsible for the correction of deficiencies<br />

caused by Federal Express.<br />

3.2 NOTICE OF DEFICIENCIES<br />

A. If Federal Express determines that a deficiency exists, Federal Express or its representative will notify the<br />

Contractor of the deficiency in writing within seven days of discovery. If the Contractor discovers a<br />

deficiency, it shall submit to Federal within seven days its recommendations for corrective actions with<br />

sufficient details to enable Federal Express to determine what corrective actions will be taken.<br />

B. Within seven days after receipt of the Contractor’s recommendation for corrective action, Federal Express<br />

or its representative will give the Contractor written instructions concerning the corrective action to be<br />

taken and the time limit allotted for it.<br />

C. The Contractor shall promptly comply with written directions to correct deficiencies. The Contractor shall<br />

also prepare and furnish to Federal, data and reports applicable to corrections required (including revising<br />

and updating other affected data called for under the Contract Documents) with no increase in the<br />

Contractor’s Fee. Corrections shall be made during such time as not to interfere with Federal’s<br />

operations.<br />

GENERAL CONDITIONS 00702 - 2