501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

G. "Work" shall be deemed to consist of all labor and operations, transportation, installation, hoisting,<br />

materials, tools, equipment, services, inspections, investigations, coordination and supervision required<br />

and/or reasonably necessary to produce the construction required by the contract documents.<br />

H. "Furnish" means the design, fabrication, purchase and delivery to the job site or other destination as<br />

directed by the Owner.<br />

I. "Install or Installation" means the act of physically placing, applying, setting, erecting, anchoring, securing,<br />

etc., construction materials, equipment, furnishings, appliances, and similar items specified and furnished<br />

at the job site. Installation of specified items shall be complete in all respects.<br />

J. "Provide" means to furnish and install construction material, equipment, etc. as defined above.<br />

Note: In addition, the following terms have the meaning indicated which are applicable to both the singular and<br />

plural thereof:<br />

K. ADDENDA: Written or graphic instructions issued prior to the opening of Bids which clarify, correct or<br />

change the bidding documents or the Contract Documents.<br />

L. AGREEMENT: The written agreement between Owner and Contractor covering the Work to be<br />

performed; other Contract Documents are attached to the Agreement and made a part thereof as<br />

provided therein.<br />

M. CHANGE ORDER: A written order to the Contractor signed by the Owner authorizing an addition,<br />

deletion or revision in the work, or an adjustment in the Contract Price or the Contract Time issued after<br />

the effective date of the Agreement.<br />

N. DAY: A calendar day of twenty-four hours measured from midnight to next midnight.<br />

O. DRAWINGS: The drawings which show the character and Scope of the Work to be performed and which<br />

are referred to in the Contract Documents.<br />

P. SHOP DRAWINGS: All drawings, illustrations, schedules and other data which are specifically prepared<br />

by the Contractor, a Subcontractor, manufacturer, fabricator, supplier or distributor to illustrate some<br />

portion of the Work and all illustrations, brochures, standard schedules, performance charts, instructions,<br />

diagrams and other information prepared by a manufacturer, fabricator, supplier or distributor and<br />

submitted by the Contractor to illustrate materials or equipment for some portions of the Work.<br />

Q. SUBSTANTIAL COMPLETION: The Work has progressed to the point where, in the opinion of the Owner<br />

as evidenced by a Certificate of Substantial Completion, it is sufficiently complete, in accordance with the<br />

Contract Documents, so that the Work can be utilized for the purposes for which it was intended.<br />

1.4 CORRELATION AND INTENT<br />

A. The Contract Documents are complementary and are intended to include or imply all items required for<br />

the proper execution and completion of the Work. However, in the case of a design/build project, the<br />

Contractor is responsible for providing approved construction documents to the extent of acquiring all<br />

required permits and approvals and complete as-built documents. Any item of work mentioned in the<br />

CONTRACT DOCUMENTS 01015 - 2