501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

specifications and not shown on the drawings, or shown on the drawings and not mentioned in the<br />

specifications, shall be provided by the Contractor as if shown or mentioned in both.<br />

B. Generally, the specifications describe work which cannot be readily indicated on the drawings and<br />

indicate types, qualities and methods of installation of the various materials and equipment required for<br />

the Work. It is not intended to mention every item of work in the specifications which can be adequately<br />

shown on the drawings or to show on the drawings all items of work described or required by the<br />

specifications even if they are of such nature that they could have been shown thereon. Materials or<br />

labor for work which are shown on the drawings or are reasonably inferable there from as being<br />

necessary to produce a finished job shall be provided by the Contractor whether or not the work is<br />

expressly covered in the specifications.<br />

C. The Contractor is responsible for the coordination of the various parts of the Work so that no part shall be<br />

left in an unfinished or incomplete condition owing to any disagreement between the various<br />

subcontractors, or the subcontractors and the Contractor, as to where the work of one begins and ends<br />

with relation to the work of the other.<br />

D. The Contractor and Subcontractors shall review other sections of work applicable to their work and<br />

ascertain requirements in other sections applicable to their own work. Each shall be held responsible for<br />

coordination and inclusion of the work indicated as if it were in the particular subcontractor's section. The<br />

Owner shall be advised of any discrepancies or conflicts within seven days before the work commences.<br />

E. All subcontractors, suppliers, etc., shall be responsible for knowing what information is given on all sheets<br />

of the plans and specifications concerning his particular work. If an item or piece of work is shown on the<br />

architectural and not on the mechanical, electrical, or structural drawings, it shall be included in the<br />

contract. The reverse conditions shall also apply.<br />

1.5 SPECIFICATION FORMAT<br />

A. The specifications are separated into titled sections for convenience only and not to dictate or determine<br />

the trade or craft involved. Such separation shall not operate to make the Owner, <strong>Construction</strong> Manager<br />

or the Architect /Engineer an arbiter for the Division of responsibility between subcontractors.<br />

END OF SECTION 01015<br />

CONTRACT DOCUMENTS 01015 - 3