04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

3. Completed data sheets for setting of over-current protective devices.<br />

3.4 OVERCURRENT PROTECTIVE DEVICE SETTING<br />

A. Manufacturer's Field Service: Engage a factory-authorized service representative, of electrical<br />

distribution equipment being set and adjusted, to assist in setting of over-current protective devices<br />

within equipment.<br />

B. Perform the following device setting and prepare reports:<br />

END OF SECTION 16031<br />

1. After installing over-current protective devices and during energizing process of electrical<br />

distribution system, perform the following:<br />

a. Verify that over-current protective devices meet parameters used in studies.<br />

b. Adjust devices to values listed in study results.<br />

c. Prepare Device Setting Report, include as a minimum: Equipment/Panel Name,<br />

Device Name and Type, Device Model No., Device Setting Value(s), Fuse type<br />

and speed, Date and Time, Initials and signature of person setting each device,<br />

Initials and signature of Owners representative witnessing device setting.<br />

ELECTRICAL PROTECTIVE DEVICE COORDINATION 16031 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!