501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

A. Work and decontamination procedures in areas containing contaminated material shall be performed in<br />

accordance with standard engineering practices.<br />

B. Employ methods necessary to isolate contaminated soils from non-contaminated soils, including<br />

trenching.<br />

C. The excavation may include removing additional soils found to contain residual contamination as<br />

directed by the Owner based on post excavation sampling and analyses described in Paragraph 3.6 of<br />

this Section.<br />

D. Separate excavated contaminated soil based on the determination that the contaminated soil could be<br />

from more than one source and by degrees of contamination (i.e., visually contaminated) or as directed<br />

by the Owner.<br />

E. Depending on conditions, “confined space entry” procedures in accordance with 29 CFR 1926.146 may<br />

be required in the excavation. Explosion-proof blowers and exhaust fans shall be provided as<br />

necessary to ventilate the excavation to prevent worker exposure. All work conducted under “confined<br />

space entry” conditions shall be performed in accordance with the Contractor’s Health and Safety Plan.<br />

The Contractor will also be required to obtain and post a confined space entry permit, if conditions<br />

require such entry.<br />

F. Keep excavated portion of the work reasonably free of water at all times, and until all work and backfill<br />

is completed.<br />

G. Shore and brace excavations where necessary to prevent cave-ins in accordance with all safety<br />

regulations.<br />

H. Conduct all soil screening and testing required by state regulations regarding excavation of<br />

contaminated soil.<br />

I. The excavation work shall be performed, protected, and supported as required for safety in the manner<br />

set forth in the operation rules, order, and regulations prescribed by the Occupational safety and Health<br />

Act (OSHA). More specifically, all excavation and trenching operations will be completed in accordance<br />

with 29 CFR 1926.651-652 standards and personnel working around or in the excavation shall wear<br />

approved head protection (e.g. hard hats and protective clothing/equipment).<br />

J. All ignition sources and gasoline-driven equipment shall be removed from areas where flammable<br />

vapors have been measured.<br />

K. All existing monitor wells in the areas of construction are not to be disturbed.<br />

3.4 STORAGE OF EXCAVATED MATERIAL<br />

A. Temporarily stock-pile excavated contaminated soil at the designated holding area.<br />

B. When stockpiling, excavated materials shall be placed on a base lined with 40 mil. (or higher gauge)<br />

polyethylene and be completely and securely covered with 15 mil. (or higher gauge) polyethylene.<br />

CONTAMINATED SOILS 02113 - 5