501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

B. Submit with transmittal. Include brochures, shop drawings, and installation instructions. Contractor shall<br />

place review stamp on sample transmittals as indication of his checking and verification of dimensions<br />

and coordination with interrelated items.<br />

C. Reviewed samples submitted or constructed constitute criterion for judging completed work. Finish work<br />

or items not equal to samples will be rejected.<br />

D. Architect /Engineer may, at his/her option, retain samples for comparison purposes until completion of<br />

work. Samples will be returned or may be used in the work unless technical section specifically indicates<br />

otherwise. Remove samples when directed. Pay all costs of furnishing or constructing and removing<br />

samples.<br />

1.8 JOB SITE DOCUMENTS<br />

A. Only accepted shop drawings shall be kept at the job site.<br />

1.9 FIELD MEASUREMENTS<br />

A. Required field measurements are the responsibility of the Contractor and will be made before shop<br />

drawings are submitted for review and approval.<br />

1.10 COLOR SELECTION<br />

A. Color selection of shop drawing items will be made by <strong>Construction</strong> Manager when other colors are<br />

selected. Contractor shall supply materials requiring color selection in a timely manner so that color<br />

selections can be established.<br />

END OF SECTION 01040<br />

SUBMITTALS 01040 - 5