04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6K IP Sort Building & Bridge Bid Evaluation<br />

Reviewer: Michael Baker Date:<br />

Rating*<br />

Category Assessment Guide Max Points Bidder A Bidder B Bidder C Bidder D Bidder E Bidder F<br />

Fee<br />

Contract Exceptions<br />

DBE Participation Goals<br />

City Of Oakland<br />

Experience<br />

Previous FedEx Project<br />

Experience<br />

Ability to develop schedule<br />

per 1320 and met staffing<br />

requirement to maintain<br />

schedule.<br />

Staff Experience<br />

Financial Stability<br />

Quality Work<br />

Max Points: Lowest fee with no scope exceptions;<br />

90 to 99% Points: Next lowest fee with no scope exceptions;<br />

80 to 89%Points: Next lowest fee with no scope exceptions;<br />

70 to 79% Points: Next lowest fee with no scope exceptions;<br />

60to 69%Points: highest fee with no scope exceptions;<br />

0% Points: Unacceptable scope exceptions<br />

76% to Max Points: No exceptions, minor exceptions, or exceptions that are<br />

acceptable to FedEx;<br />

26% to 75%Points: Exceptions that require negotiation;<br />

0% to 25% Points: Exceptions that are unacceptable to FedEx or refuses local<br />

contract labor requirements<br />

76% to Max Points: Meets or exceeds goal of 16.9% MBE & 4.5% WBE or<br />

combined 21.4% DBE;<br />

26% to 75%Points: 10.7% DBE Participation;<br />

0% to 25% Points:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!