501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

SECTION 15010 - GENERAL PROVISIONS - MECHANICAL<br />

PART 1 - GENERAL<br />

1.1 SCOPE<br />

A. The requirements of the Contract Forms, the Conditions of the Contract, and Division 1 shall apply<br />

to this Section, except as herein modified.<br />

B. This Division describes the Mechanical Work required for this project. The work shall be as<br />

detailed on the Drawings and as herein specified, and as required by good installation practice to<br />

make a complete and operational system.<br />

C. This work shall generally consist of, but shall not be limited to, the furnishing, installing and<br />

connecting of the systems or items delineated in the following Sections and Division 1:<br />

Section 15010 General Provisions – Mechanical<br />

Section 15012 Fed-Ex Facility EPN (Equipment Numbering) Numbering Standards<br />

Section 15040 LEED Requirements and LEED Points Checklist<br />

Section 15050 Basic Materials and Methods<br />

Section 15250 Insulation<br />

Section 15401 Domestic Water System<br />

Section 15405 Soil and Waste System<br />

Section 15407 Natural Gas System<br />

Section 15412 Air Conditioning Condensate System<br />

Section 15423 Pipe and Valve Identification<br />

Section 15425 Piping Tests<br />

Section 15450 Plumbing Fixtures and Trim<br />

Section 15550 Fire Protection<br />

Section 15733 Packaged Rooftop Air Conditioning Units<br />

Section 15734 Packaged Rooftop Air Conditioning Units (15 tons and under)<br />

Section 15800 Air Distribution<br />

Section 15840 Air Terminal Units – Variable Volume<br />

Section 15900 Direct Digital Control System<br />

Section 15990 Air Testing and Balancing<br />

D. Place equipment in initial operation, make required adjustments and balancing, make initial tests<br />

to ensure compliance with Specifications and their intent, obtain approval in writing from governing<br />

bodies having jurisdiction over this work to ensure compliance with all laws and ordinances in<br />

effect.<br />

E. The Drawings and Specifications are generally indicative of the work to be installed but do not<br />

necessarily show every item or detail required for proper operation and service. No extras will be<br />

allowed for items such as but not limited to offsets, fittings, supports, valves, thermometers and<br />

gauges, etc. which are required for proper operation and maintenance, but which may not be<br />

shown.<br />

GENERAL PROVISIONS – MECHANICAL 15010-1