04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

SECTION 15700 - HEAT TRANSFER EQUIPMENT<br />

PART 1 - GENERAL<br />

GENERAL<br />

1.1 SCOPE<br />

A. The requirements of Section 15010 shall apply to this Section except as modified.<br />

B. The work included in this Section shall consist of installation of the complete and operating Heat<br />

Transfer Equipment. This shall include equipment and associated specialties as shown on the<br />

Drawings and specified.<br />

1.2 PRODUCTS FURNISHED BUT INSTALLED BY ANOTHER SECTION OR DIVISION<br />

A. Roof Curbs (installed, set, and flashed) – Roofing Contractor. Provide roof openings and steel<br />

supports as required. Refer to Section 15010, GENERAL PROVISIONS. Roof curbs for standing<br />

seam metal roof shall be furnished and installed by Roofing Contractor.<br />

1.3 QUALITY ASSURANCE<br />

A. Refer to Specification Section 15010, GENERAL PROVISIONS - MECHANICAL, paragraph<br />

“CODES AND STANDARDS”.<br />

1.4 INDEX OF SPECIFIED PRODUCTS AND SUBMITTAL REQUIREMENTS<br />

A. The following is a list of Products specified within this Section. Provide submittals to the Engineer<br />

for review in accordance with requirements established within Section 01300 for only those<br />

Products indicated.<br />

SPECIFIED PRODUCTS SUBMITTAL REQUIRED<br />

Ductless Split System Air Conditioning Unit/Heat Pump Units YES<br />

1.5 PRODUCT DELIVERY, HANDLING, AND STORAGE<br />

A. Refer to Section 15010, GENERAL PROVISIONS.<br />

HEAT TRANSFER EQUIPMENT 15700-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!