501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

escorts can be hired on an hourly basis as needed and this cost shall be included in the Bid. Refer to<br />

Section 01112 for more information.<br />

1.13 TEMPORARY FACILITIES, STORAGE AREAS AND SANITARY FACILITIES<br />

A. Contractor shall provide and maintain its own job site trailer and sanitary facilities kept within the<br />

contractor’s construction work area. No additional areas on-site for materials storage, lay down or<br />

temporary storage will be provided by Federal Express. Contractor shall provide its own off-site storage<br />

and parking areas if additional space is required and shall include all such costs in the Bid.<br />

1.14 CUTTING AND PATCHING<br />

A. Generally, cutting of new construction shall be avoided wherever possible by the proper coordination<br />

between the various trades, and by the placing of proper sleeves, inserts, bolts, and other items in the<br />

construction as the work progresses.<br />

B. However, where subsequent cutting of new construction or cutting of existing construction is required, it<br />

shall be done in a neat, careful, and approved manner, without unnecessary or extensive damage to the<br />

construction involved, and only to such an extent that is reasonably necessary for the installation of the<br />

work.<br />

C. All patching, repairing, and altering shall be done only by mechanics skilled in the various trades involved,<br />

using materials and workmanship to match those of the original construction in type and quality.<br />

D. All existing construction which is disturbed or damaged in any way by the Contractor’s operations shall be<br />

restored at least to the conditions which existed before work was begun, unless otherwise indicated.<br />

1.15 COORDINATION WITH CITY AND PORT OF OAKLAND<br />

A. City of Oakland: The Contractor is responsible for communicating and coordinating with the City of<br />

Oakland for all electrical, mechanical, plumbing, and other necessary construction permits and<br />

inspections. The Contractor is responsible for following the City of Oakland’s Waste Management<br />

program. Such coordination may also include the preparation and approval of a site specific SWPPP. See<br />

section 01050<br />

B. Port of Oakland: The Port of Oakland is the owner of the FedEx property. Federal Express holds a longterm<br />

lease. The Port may inspect work under this contract and make recommendations at their discretion.<br />

The Contractor shall be responsible for various items to be coordinated with Port officials. Such<br />

coordination may also include the preparation and approval of a site specific SWPPP. See section 01050<br />

C. The Contractor shall notify the <strong>Construction</strong> Manager of all communications with the City of Oakland, Port<br />

of Oakland, PGE and other permitting/approval agencies and provide all written records of documents<br />

exchanged with such agencies.<br />

SPECIAL CONDITIONS OF CONTRACT 00711 - 5