change in the Work that Contractor will be performing through the<br />

use of one or more Subcontractors; and<br />

(ii) In the case of changes that will reduce the scope of the Work, the following<br />

requirements with respect to the adjustments in contract sums payable to<br />

affected Subcontractors and to the adjustment of the Contractor’s Fee will<br />

apply:<br />

(a) Each Subcontractor that intended to perform any part of that portion<br />

of the Work eliminated from the scope of the Work through the use<br />

of its own forces must reduce the overhead and profit encompassed<br />

within the contract sum set forth in its Subcontract by five percent<br />

(5%) of the Subcontractor’s good faith estimate of the Cost of the<br />

Change, as defined below, for that part of the Work to be eliminated;<br />

(b) Each Subcontractor that intended to perform any part of that portion<br />

of the Work eliminated from the scope of the Work through the use<br />

of one or more lower-tier Subcontractors must reduce the overhead<br />

and profit encompassed within the contract sum set forth in its<br />

Subcontract by five percent (5%) of the Subcontractor’s good faith<br />

estimate of the Cost of the Change, as defined below, for that part of<br />

the Work to be eliminated;<br />

(c) Contractor must reduce the overhead and profit encompassed within<br />

the Contractor’s Fee by five percent (5%) of Contractor’s good faith<br />

estimate of the Cost of the Change associated with that part of the<br />

Work to be eliminated that Contractor planned to perform through<br />

the use of its own forces; and<br />

(d) Contractor must reduce the overhead and profit encompassed within<br />

the Contractor’s Fee by five percent (5%) of Contractor’s good faith<br />

estimate of the Cost of the Change associated with that part of the<br />

Work to be eliminated that Contractor planned to perform through<br />

the use of one or more Subcontractors.<br />

The parties will memorialize a change that enlarges the scope of the Work by means of an<br />

“Additive Change Order” and will memorialize a change that reduces the scope of the Work by<br />

means of a “Deductive Change Order”. In the context of an Additive Change Order:<br />

(i) a Subcontractor’s “Cost of the Change” will be the net increase in the cost<br />

categories identified below that the Subcontractor will realize by reason of<br />

the performance of the extra work or the implementation of the changes in<br />

the Work described in the Change Order, and<br />