04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1. Escorts procured from Aviation Safeguards Inc. shall be coordinated through Federal Express.<br />

Contractor shall contact the following FedEx personnel no less than 48 hours prior to when an<br />

escort is needed:<br />

a. Stephen Walker: 510-639-3804 (office), 510-639-3825 (cell), stephen.l.walker@fedex.com<br />

b. Daniel Roldan<br />

c. Stewart Prophett<br />

2. Contractor is responsible for determining and specifying the number of escorts needed and for the<br />

duration that each escort will need to be on duty.<br />

3. Contractor is responsible for all costs associated with hired escorts, including overtime hours.<br />

1.7 WORKER IDENTIFICATION PROVIDED BY THE CONTRACTOR<br />

A. In addition to identification supplied by Federal Express, the Contractor shall provide each of its<br />

employees and sub-contractor’s employees with a Photo I.D. Badge.<br />

B. Badges must be presented to gain entry to the Site. The Contractor shall provide monitoring to ensure that<br />

only its authorized personnel bearing badges are admitted to the facility.<br />

C. When additional security measures are required, Federal Express will present these at the Pre-Bid<br />

Meeting.<br />

1.8 ACCESS GATES<br />

A. Upon receipt of a complete list of sub-contractors (and sub sub-contractors), Federal Express’<br />

Representative will notify the Contractor, in writing, of the designated gates(s) to be used by it and its subcontractors.<br />

Signs may be posted by Federal Express at each gate displaying the names of contractors<br />

and sub-contractors who use that gate.<br />

B. It shall be the Contractor’s responsibility to maintain any reserved gate system identified by Federal<br />

Express and to take immediate action to remedy problems that result in picketing directed at the<br />

Contractor.<br />

C. The access gate(s) described above will be the only authorized entry and exit point(s) to Federal Express’<br />

facility for Contractor employees.<br />

D. Access gates leading into a non-AOA portion of the job may be manned by any appropriate and<br />

responsible person that is an agent of the contractor or associated subcontractors.<br />

E. Access gates that lead into an AOA portion of the site may only be opened, closed, and manned by the<br />

following individuals:<br />

1. Port of Oakland security personnel (ABC Security guard)<br />

2. FedEx security personnel (Aviation Safeguard guard)<br />

3. Alameda County Sherriff<br />

SAFETY AND SECURITY REQUIREMENTS 01112 - 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!