04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

perform the Work in the State and locality in which the Site is located, (iii) it is qualified, willing<br />

and able to perform the Work, and (iv) it has the expertise and ability to provide Services and<br />

Materials that will meet FedEx’s objectives and requirements and that will comply with all<br />

applicable Legal Requirements.<br />

Section 10.06. Utilities.<br />

As part of the Work, Contractor must provide and pay for all<br />

utility services required for the performance of the Work. FedEx will provide water, gas and<br />

electrical power for use in the Work only to the extent of the capacity of the utility system<br />

infrastructure in place as of the date on which Contractor commences the Work. As part of the<br />

Work, Contractor must provide and pay for connections to and extensions from that<br />

infrastructure and for the means of distributing those utility services within the Site during the<br />

performance of the Work. Contractor must, however, pay for all utility consumption charges that<br />

are attributable to water that is wasted or expended without proper regard for ecological and<br />

conservation considerations, the use of electric heating devices, and utility services used within<br />

Contractor’s field offices.<br />

Section 10.07. Cutting and Patching.<br />

Contractor shall do in accordance with the Contract<br />

Documents all necessary cutting, fitting and patching of the Work that may be required to make<br />

the several parts come together properly and fit the Work to receive or to be received by work of<br />

Separate Contractors shown upon, or reasonably implied by, the Contract Documents. In laying<br />

out the Work, Contractor shall examine the work installed by Separate Contractors and the shop<br />

drawings of work to be installed by Separate Contractors prior to beginning the installation of the<br />

Work. By beginning the installation of an element of the Work, Contractor conclusively accepts<br />

all preceding work as suitable and proper to receive that element of the Work unless it gives<br />

written notice to FedEx to the contrary before beginning that installation. If Contractor and a<br />

Separate Contractor fail to agree as to the extent of cooperation to be exhibited, or of work to be<br />

done by either, to ensure the carrying out of their respective agreements, FedEx’s Representative<br />

(as defined below in Section 11.01) will resolve the disagreement and his or her decision will be<br />

final and bind all parties.<br />

ARTICLE 11<br />

FEDEX'S REPRESENTATIVE<br />

Section 11.01. FedEx's Representative. In its Notice to Proceed, FedEx shall designate its<br />

representative for the Work ("FedEx's Representative"). FedEx's Representative will have full<br />

authority to stop the Work whenever, in his or her best judgment, the stoppage may be necessary<br />

to ensure the proper execution of the Work. FedEx's Representative will have authority to reject<br />

any Work that does not conform to the requirements of this Agreement or the other Contract<br />

Documents and to decide questions that arise during the performance of the Work. FedEx's<br />

Representative will also designate in writing all persons in FedEx's employ, who are authorized<br />

to have access to the Site. FedEx has the right to replace its Representative at any time and for<br />

any reason. Contractor may not accept direction, nor permit any of its Subcontractors to accept<br />

direction, from any FedEx employee other than FedEx’s Representative and the FedEx<br />

employees that FedEx’s Representative specifically designates by written notice to Contractor.<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!