04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

C. Submitted plans and specifications must include all details and information required by NFPA13,<br />

other applicable NFPA Standards and applicable Insurance Company Interpretive Guides. Review<br />

information for accuracy before sending to Insurance Company. Incomplete submissions will not<br />

be reviewed.<br />

D. Submission of a proposal shall form as acknowledgement that the Contractor has contacted the<br />

aforementioned agencies and that the work provided under this Section shall be in full accordance<br />

to their requirements. Additional work required by the Contractor's failure to complete the above<br />

shall be completed at no additional compensation to the Contractor.<br />

E. Six sets of blue line prints of these approved drawings and six sets of hydraulic calculations each<br />

bearing the approval stamp of the aforementioned agencies (including the Owner's insuring<br />

agency) shall be forwarded to the Engineer for review. Submittals not bearing the seal and<br />

signature of a licensed professional engineer, and the approval stamp of the aforementioned<br />

agencies shall be returned by the engineer without action.<br />

F. Provide submittals to the Engineer for review in accordance with the requirements established<br />

within Section 01300 for the following products:<br />

SPECIFIED PRODUCTS SUBMITTAL REQUIRED<br />

Drawings YES<br />

Hydraulic Calculations (submitted in the form outlined in NFPA-13) YES<br />

Alarm Check Valve YES<br />

OS&Y Valves YES<br />

Water Check Valves YES<br />

Pipe and Fittings YES<br />

Water Flow Switch YES<br />

Sprinkler Heads YES<br />

Fire Department Connection YES<br />

Tamper Switches YES<br />

Water Motor Alarm YES<br />

Pipe Hangers and Supports YES<br />

Pipe Tests and Reports YES<br />

System Trip Tests and Reports YES<br />

Nameplates and Identification Signs YES<br />

Operating and Maintenance Manuals YES<br />

Instructions YES<br />

Instruction Verification YES<br />

Record Drawings YES<br />

G. Samples<br />

1. Provide samples to the Engineer in accordance with the requirements established within<br />

Section 01300 for the following:<br />

Grooved Type Couplings and Gaskets<br />

Sprinkler Head<br />

1.7 PRODUCT DELIVERY, HANDLING AND STORAGE<br />

A. Refer to Section 15010, GENERAL PROVISIONS - MECHANICAL.<br />

FIRE PROTECTION 15550-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!