501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

5. Submittals<br />

6. Certifications<br />

Tests and balance reports<br />

Approvals and acceptance certifications<br />

Complete set of approval Drawings<br />

Complete set of calculations<br />

III. Section II shall be repeated for each technical Section and system provided.<br />

C. Manuals shall be in loose-leaf form and bound in a heavy binder with tabbed sectional dividers.<br />

One final copy shall be forwarded to the Engineer for review. This copy shall be retained by the<br />

Engineer. The remaining three operating manuals shall be delivered to the Owner prior to any<br />

equipment or systems being placed or left in operation and the instructions given to the Owner's<br />

personnel.<br />

2.3 INSTRUCTIONS<br />

A. Prior to acceptance, upon completion of work and tests and at a time as approved by the<br />

Engineer, the Contractor, and factory trained representatives of the equipment manufacturers shall<br />

fully instruct the Owner's personnel so that they are completely familiar with operation and<br />

maintenance of all equipment.<br />

B. During this instruction period, the Owner's personnel shall be thoroughly versed in the operation<br />

and maintenance of the mechanical systems. Emergency and safety procedures shall be<br />

emphasized. Operation of each piece of equipment shall be demonstrated. Conduct a "thumbthrough"<br />

explanation of the operation and maintenance manuals. No equipment or systems shall<br />

be placed and left in operation prior to reception of the Operation and Maintenance Manuals and<br />

the Owner's personnel receiving operating instructions.<br />

C. On completion of the instruction period, provide written verification to the Engineer as to when the<br />

instructions were given, the Owner's personnel who attended the instructions, from whom the<br />

instructions were given, description of instructions given, and that the Owner's personnel are in<br />

receipt of the maintenance manuals. This information shall be forwarded for inclusion within the<br />

operating and maintenance manuals.<br />

D. The Engineer shall be present during these instructions should he so desire.<br />

2.4 ELECTRICAL WORK<br />

A. Furnish and install motors and disconnect switches as hereinafter specified for all equipment<br />

furnished under this Division. All motors supplied under this Contract shall be inherently protected.<br />

The Division 16 Contractor shall perform all power wiring, unless otherwise specified.<br />

GENERAL PROVISIONS – MECHANICAL 15010-8