501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

4. Adherence to schedule: When the testing laboratory is ready to test according to the<br />

established schedule, but is prevented from testing or taking specimens due to<br />

incompleteness of the work, all extra charges for testing attributable to the delay may be<br />

back-charged to the Contractor and shall not be borne by the Owner.<br />

1.11 ALTERNATIVE INSPECTION PROCEDURE<br />

A. The <strong>Construction</strong> Manager shall have the right to required alternative inspection procedure other<br />

than as specified when, in the <strong>Construction</strong> Manager’s judgment; other inspections are required to<br />

demonstrate compliance with the Contract requirements. Costs of such alternative inspections will<br />

be borne by the Owner if products are found to comply; otherwise, costs shall be borne by the<br />

Contractor.<br />

END OF SECTION 01075<br />

TESTING LABORATORY SERVICES 01075 - 3