501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

D. Fire-alarm system will be considered defective if it does not pass tests and inspections.<br />

E. Prepare test and inspection reports.<br />

F. Maintenance Test and Inspection: Perform tests and inspections listed for weekly, monthly, quarterly, and<br />

semiannual periods. Use forms developed for initial tests and inspections.<br />

G. Annual Test and Inspection: One year after date of Substantial Completion, test fire-alarm system<br />

complying with visual and testing inspection requirements in NFPA 72 “National Fire Alarm Code”. Use<br />

forms developed for initial tests and inspections.<br />

H. Five bound copies of complete Operations and Maintenance Manuals shall be provided as part of the<br />

close out of the work. These manuals shall include the following as a minimum:<br />

1. Index of the enclosed materials<br />

2. Copies of approved drawings<br />

3. List of recommended spare parts<br />

4. Printout of the final copy of the system program<br />

5. Record drawings<br />

6. Operation, maintenance and repair procedures from the manufacturer<br />

7. Copy of the signed and completed “Record of Completion Form” as described in<br />

NFPA 72<br />

END OF SECTION 16600<br />

DIGITAL, ADDRESSABLE FIRE-ALARM AND DETECTION SYSTEM 16600- 8