501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

B. The data shall include the name and address of the nearest service and maintenance organization that<br />

regularly stocks repair parts. No consideration will be given to partial lists submitted. Materials,<br />

equipment and fixtures will not be acceptable for use at capacity ratings in excess of manufacturer's<br />

published data. Approval of materials and equipment will be tentative, subject to submission of complete<br />

shop drawings indicating compliance with the contract documents.<br />

1.5 CERTIFICATES OF COMPLIANCE<br />

A. Any certificates required for demonstrating proof of compliance of materials with specification<br />

requirements, including mail certificates, statements of application and extended guarantees, shall be<br />

executed in quadruplicate and furnished to the Owner at least ten days prior to delivery.<br />

B. It shall be Contractor's responsibility to review all certificates before submissions are made to the Owner<br />

to ensure compliance with the contract specification requirements and proper execution of the affidavit<br />

prior to submission to the Owner. Each certificate shall be signed by an official authorized to certify in<br />

behalf of the manufacturing company and shall contain the name and address of the Contractor, the<br />

project name and location, and the quantity and date or dates of shipment or delivery to which the<br />

certificates apply.<br />

C. Copies of laboratory test reports submitted with certificates shall contain the name and address of the<br />

testing laboratory and the date or dates of the tests to which the report applies.<br />

D. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if,<br />

after tests are performed on selected samples, the material is found not to meet the specific<br />

requirements.<br />

1.6 REVIEW BY ENGINEER<br />

A. Checking of shop drawings and submittals by Architect / Engineer will be on the basis of conformity with<br />

design intent only. Quantities and dimensions are the responsibility of the Contractor.<br />

B. Checking of shop drawings or submittals by Architect / Engineer shall not relieve the Contractor of<br />

responsibility for accuracy for such shop drawings, nor for proper fitting, construction of work, furnishing of<br />

material or work required by the Contract Documents and not indicated on the shop drawings. Shop<br />

drawings or product data checking shall not be construed as approval of departure from requirements of<br />

the Contract Documents.<br />

C. Corrections or changes indicated on Shop Drawings shall not be considered as extra work ordered. If<br />

Shop Drawings show variations from Contract requirements because of standard shop practice, or other<br />

reasons, make specific mention of such variations in submittal letter. Do not execute work required by<br />

Shop Drawings until acceptance is given.<br />

1.7 SAMPLES<br />

A. Where samples are needed, submit four samples to the <strong>Construction</strong> Manager. Identify samples as to:<br />

manufacturer, item, use, type, project designation, specification section or drawing detail reference, color,<br />

range, texture, finish or other pertinent data.<br />

SUBMITTALS 01040 - 4