workers performing the Work to read the Safety Manuals in their entirety and, at FedEx’s request<br />

from time to time made, shall acknowledge that all workers then performing the Work understand all<br />

parts of the Safety Manuals.<br />

(d) FedEx must be able to contact the Superintendent via telephone at all times during<br />

which work is not actually being performed on the Site, such as nights, weekends and legal<br />

holidays. To that end, Contractor shall regularly provide to FedEx’s Representative the names<br />

and telephone number of the Superintendent that will be on-call during an upcoming hiatus in the<br />

performance of the Work.<br />

Section 12.06. Inspection of the Work.<br />

(a) FedEx and its designees must have access to the<br />

Work at all times for the purpose of inspecting it, and Contractor shall provide proper facilities<br />

for such access and inspection. If any portion of the Work that FedEx wishes to inspect is<br />

covered or concealed, Contractor shall uncover it at FedEx’s direction for observation and,<br />

following FedEx’s inspection, shall restore the area affected by the uncovering. If the designated<br />

portion of the Work was covered before Contractor’s receipt of FedEx’s specific request that it<br />

remain uncovered and if the Contract Documents did not restrict the covering of that portion of<br />

the Work, Contractor will be entitled, to the extent provided in Sections 3.03 and 3.04, to an<br />

adjustment to the Substantial Completion Date and the Contractor’s Fee, except as provided to<br />

the contrary below. If, however, the designated portion of the Work was covered contrary to<br />

FedEx’s prior request that it remain uncovered or contrary to the express requirements of the<br />

Contract Documents or FedEx’s inspection reveals that the designated portion of the Work is<br />

defective, Contractor will not be entitled to any adjustment to the Substantial Completion Date or<br />

the Contractor’s Fee by reason of the uncovering or restoration of the designated portion of the<br />

Work. If FedEx's designees discover any defective Work by reason of any such inspection,<br />

FedEx shall report it to Contractor.<br />

(b) If the Contract Documents, FedEx's written instructions or applicable Legal<br />

Requirements require that special tests or inspections be conducted with respect to any of the<br />

Work, Contractor shall notify FedEx of its readiness for inspection and testing and, if a public<br />

authority, rather than FedEx, will perform the test or inspection, the date set for such test or<br />

inspection. FedEx shall make its inspections promptly and, where practicable, at the source of<br />

supply. If Contractor or any Subcontractor covers any of the Work without the approval or<br />

consent of FedEx or any public authority having jurisdiction over the Work, Contractor shall<br />

cause it to be uncovered for examination, at Contractor's expense, if required by FedEx or the<br />

public authority.<br />

(c) If testing procedures or inspections reveal any defective Work, Contractor shall correct<br />

it promptly and shall pay all costs made necessary by the defect, including, without limitation,<br />

the cost of repeated testing procedures or inspections and any increase in compensation that<br />

FedEx must pay to any of FedEx’s architects, engineers and other consultants by reason of the<br />

defect or the additional testing or inspections.<br />