501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

SECTION 02220 - SITE DEMOLITION<br />

PART 1 - GENERAL<br />

1.1 REGULATORY REQUIREMENTS<br />

A. Conform to applicable State and local codes for demolition of facilities, safety of adjacent facilities, dust control, and<br />

runoff control.<br />

B. Obtain required permits and licenses from appropriate authorities. Pay associated fees including disposal charges.<br />

C. Notify affected utility companies before starting work and comply with their requirements.<br />

D. Do not close or obstruct public or private roadways, operational traffic corridors, sidewalks, or fire hydrants without<br />

appropriate permits or written authorization.<br />

E. Conform to applicable regulatory procedures when hazardous or contaminated materials are discovered.<br />

F. Comply with the City of Oakland regulations by preparing and enacting a Waste Reduction and Recycling Plan<br />

(WRRP). For more information, reference http://oaklandrecycles.com/page.<br />

1.2 SUBMITTALS<br />

A. Project Record Documents: Accurately record actual locations of capped utilities and subsurface obstructions that<br />

will remain after demolition. Submit record as part of closeout submittals.<br />

1.3 PROJECT CONDITIONS<br />

A. Owner assumes no responsibility for condition of structures to be demolished.<br />

B. Conditions existing at time of inspection for bidding purposes will be maintained by Owner as reasonably practical.<br />

C. Unless otherwise indicated in Contract Documents or specified by the Owner, items of salvageable value to Contractor<br />

shall be removed from site. Storage or sale of removed items on site will not be permitted and shall not interfere<br />

with other work specified.<br />

PART 2 - PRODUCTS<br />

2.1 FILL MATERIALS<br />

A. Fill material shall be Engineered Fill materials as specified in Section 02300.<br />

PART 3 - EXECUTION<br />

3.1 PREPARATION<br />

A. Provide, erect, and maintain erosion control devices, temporary barriers, and security devices at locations indicated<br />

on <strong>Construction</strong> Drawings.<br />

SITE DEMOLITION 02220 - 1