501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

SECTION 00320 - GEOTECHNICAL REPORT<br />

1.1 SUMMARY<br />

A. A geotechnical report was prepared by Kleinfelder. The report was entitled: “Geotechnical Investigation,<br />

Federal express Sort Building, Federal express Terminal, Oakland, California”; dated August 23, 2011.<br />

B. Geotechnical report information represents only the conditions found during the exploration and does not<br />

constitute a representation, either expressed or implied, that the conditions indicated are typical of those<br />

throughout the Project site or any part of the Project site. The information is available to assist the<br />

Contractor in evaluating the extent and complexity of the Work. Design recommendations which may<br />

appear in the soil consultant's report are made only for evaluation purposes and are not in any manner a<br />

part of the Contract Documents or of the Contract between the Contractor and the Owner.<br />

C. Without cost to the Owner, the Contractor may request permission to make additional soil borings or other<br />

explorations necessary to further determine the Project site conditions. Coordinate additional exploratory<br />

work with the Owner so as not to interfere with Owner's use of the Project site.<br />

D. Upon completion of additional exploratory work, backfill the test holes and pits using removed material. If<br />

removed material is not sufficient, provide additional compactable material of character similar to the native<br />

soil. Compact the backfill to same density as adjacent soil.<br />

E. The Contractor shall be fully responsible for any deductions or conclusions made on the basis of information<br />

contained in the appended report and findings of additional explorations.<br />

F. All Geotechnical information is provided as an attachment to this specification.<br />

END OF SECTION 00320<br />

GEOTECHNICAL REPORT 00320 - 1