501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

(American Institute of Steel <strong>Construction</strong>”, “AWS” (American Welding Society), Federal Specifications,<br />

“NEC” (National Electric Code), or others, in all cases the latest published editions of such referenced<br />

standard publications in effect at the time of receipt of bids shall apply.<br />

1.7 STANDARD EQUIPMENT AND EQUIPMENT INSTALLATION<br />

A. Except where special equipment is required, it is the general intent of the Technical Specifications that<br />

manufacturers’ standard equipment shall be furnished, and minor variations from the Technical<br />

Specifications to accommodate manufacturers’ standard equipment will be permissible, provided that the<br />

proposed equipment complies substantially with the Technical Specifications, and that it will accomplish<br />

the required results, all to the Architect / Engineer’s satisfaction.<br />

B. In addition to the requirements specified in the Technical Specifications, each item of equipment shall<br />

have all features and accessories as standard with its manufacturer and/or required for a complete<br />

operational unit.<br />

C. Install all equipment in accordance with the manufacturers’ recommendations, as indicated on the<br />

drawings, and as specified. If the drawings and/or specifications conflict with the manufacturers’<br />

recommendations, the Contractor shall report this to the Architect / Engineer for decision before<br />

proceeding with the work.<br />

1.8 ACCURACY OF DATE AND INTERFERENCES<br />

A. All work shall be installed to conform as nearly as possible with the dimensions, elevations, locations, and<br />

arrangements indicated, with only such minor adjustments as necessary to coordinate the work of the<br />

various trades and specification divisions and/or sections; to coordinate the work of this contract with that<br />

of other contracts; to accommodate the actual equipment furnished; to avoid all interferences between the<br />

various parts of the work; and to accommodate existing conditions which may differ from those indicated.<br />

Any and all parts of the work installed under this contract which interfere with other parts of the work or<br />

other contracts, or which deviate from the drawings and specifications without the Architect / Engineer’s<br />

prior approval shall be altered by the Contractor at his own expense, to clear such interferences, or to<br />

comply with the drawings and specifications. All interferences or discrepancies which may be discovered<br />

or anticipated shall be reported promptly to the Architect /Engineer for decision before proceeding with the<br />

work. The Architect / Engineer shall have the privilege of authorizing minor changes without additional<br />

cost, provided that such changes are made prior to the commencing of work on the item.<br />

1.9 SCHEDULING, SUBMITTALS AND REQUESTS FOR INFORMATION<br />

A. Within five days after the effective date of the Agreement, Contractor shall submit to <strong>Construction</strong><br />

Manager, for review and acceptance, a final proposed Critical Path construction schedule indicating the<br />

starting and completion dates of the various stages of the Work, a preliminary schedule of Shop Drawings<br />

submissions, and a preliminary schedule of values of the Work. Key partial completion and Substantial<br />

Completion dates shall be identified.<br />

B. Before Contractor commences Work at the site, Contractor shall deliver to Owner certificates of insurance<br />

(or other evidence of insurance) requested by Owner which Contractor is required to purchase and<br />

maintain.<br />

SPECIAL CONDITIONS OF CONTRACT 00711 - 3