501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

PART 3 - EXECUTION<br />

3.1 ANALYSIS<br />

15. Required Protective Fire Rated Clothing Type and Class<br />

A. Analyze the short circuit, protective device coordination, and arc flash calculations and highlight<br />

any equipment that is determined to be underrated or causes an abnormally high incident energy<br />

calculation. Propose approaches to reduce the energy levels. Proposed major corrective<br />

modifications will be taken under advisement by the Engineer, and the Contractor will be given<br />

further instructions.<br />

3.2 REPORT<br />

A. The results of the power study shall be summarized in a final report. The report shall include the<br />

following sections:<br />

END OF SECTION 16032<br />

1. Introduction, executive summary and recommendations, assumptions, reduced copy of<br />

the one line drawing.<br />

2. Arc Flash Evaluations Summary Spreadsheet<br />

3. Bus Detail Sheets<br />

4. Arc Flash Hazard Warning Labels printed in color on adhesive backed labels.<br />

ARC FLASH HAZARD STUDY 16032 - 3