501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1.11 CONTROL OF STORM WATER DURING CONSTRUCTION<br />

A. Contractor shall fully comply with all of the conditions and requirements of State Water Resource<br />

Control Board (“SWRCB”) Order No/99-08-DWQ, NPDES General Permit No. CAS000002, Waste<br />

Discharge Requirements for Storm Water Discharges Associated with <strong>Construction</strong> Activity<br />

(“<strong>Construction</strong> General Permit”), as said permit has been or may be amended, modified or<br />

superseded, subject to the conditions, requirements and qualifications below.<br />

1. As required by the <strong>Construction</strong> General Permit, the Contractor will file with the SWRCB a<br />

notice of intent (“NOI”) to initiate permit coverage, and a Notice of Termination (“NOT”) to<br />

terminate permit coverage. The NOI will give the Contractor a WDID number which shall be<br />

pertinent for the SWPPP described below.<br />

2. Contractor shall prepare, maintain, update and implement a site-specific Storm Water<br />

Pollution Prevention Plan (“SWPPP”) in compliance with all the requirements and conditions<br />

of the <strong>Construction</strong> General Permit and any existing Port Storm Water Ordinance while<br />

construction is ongoing. The SWPPP shall include a Storm Water Sampling and Analysis<br />

Plan (“SWSAP”) in full compliance with the <strong>Construction</strong> General Permit. At least 25 business<br />

days before commencement of construction activities, the SWPPP shall be submitted to the<br />

Port for comment and/or approval. <strong>Construction</strong> shall not commence until the Port has<br />

approved the SWPPP. Contractor shall keep and maintain an updated copy of the SWPPP at<br />

the construction site available for inspection during the course of the construction activities.<br />

Contractor shall deliver revised or updated SWPPPs whenever substantive modifications are<br />

made, and at least annually by September 15.<br />

i. As a condition of permit issuance, the contractor shall submit the SWPPP to the City<br />

of Oakland as soon as practically possible. Contact Jeff Hutcher at (510) 238-2953.<br />

ii. <strong>Construction</strong> activities shall not be permitted to commence until the SWPPP is<br />

approved by the Port of Oakland. Contact Colleen Liang at (510) 627-1198.<br />

3. Contractor shall undertake all monitoring, sampling and reporting required by the <strong>Construction</strong><br />

General Permit, and applicable to construction activities, and to provide the results of such<br />

inspections, monitoring, sampling and reporting to Port within three (3) days after the<br />

completion of such activity, or as otherwise directed by the Port.<br />

4. Contractor shall provide the Port the general contractor’s certification of compliance in<br />

accordance with the <strong>Construction</strong> General Permit at least 15 days prior to the submittal date<br />

of each annual Port certification of compliance, and at such times as Port may reasonably<br />

request, while construction is ongoing.<br />

5. <strong>Construction</strong> activities shall be considered ongoing until a NOT and post-construction Best<br />

Management Practices plan (if required) are filed with and approved by the California<br />

Regional Water Quality Control Board (“RWQCB”) as provided by the <strong>Construction</strong> General<br />

Permit.<br />

6. If the construction site does not comply with these Specifications, Contractor shall, at its cost,<br />

promptly take all action necessary to bring the construction site into compliance. Upon receipt<br />

of any enforcement action against the Port for alleged violation of the <strong>Construction</strong> General<br />

Permit, whether by a 60-day notice letter from a citizen pursuant to 42 U.S.C. Section 1365(a),<br />

or by a notice of violation, a notice to comply, cease and desist order, cleanup and abatement<br />

TEMPORARY FACILITIES AND SERVICES 01050 - 5