04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

2. Metal Wall Panel B: Fluropon Classic II, a Mica Fluoropolymer paint multi-coat system.<br />

2.7 COLORS<br />

A. The exterior and interior faces of panels and flashings shall receive factory applied colors:<br />

1. Interior Facing:<br />

a. Sandstone SM, #433R396 as manufactured by Kingspan.<br />

2. Exterior Facing:<br />

PART 3 - EXECUTION<br />

3.1 INSPECTION<br />

a. Metal Wall Panel A: Regal White SM #431R444 as manufactured by Kingspan.<br />

b. Metal Wall Panel B: Silversmith SM #439RZ1541M as manufactured by Kingspan.<br />

A. Examine alignment of structural steel to ensure conformance to the tolerance requirements of CSA<br />

Standard S16.1 and/or AISC Code section 7.13 prior to panel installation and do not proceed until all<br />

observed defects are corrected by the contractor.<br />

3.2 INSTALLATION<br />

A. Install composite panels, clips, fasteners, joint fillers, trims, flashings and related sealants in accordance<br />

with approved shop drawings. Comply with panel manufacturers’ general instructions and<br />

recommendations for installation and as applicable for project conditions to ensure low temperature<br />

and/or weatherproof performance of composite panel system.<br />

B. Consult panel manufacturer for location, type, and frequency of fasteners.<br />

C. Adjacent panels shall be mechanically interlocked at their vertical edges with the roll-formed tongue and<br />

groove profile.<br />

D. Flashing and trim shall be installed true and in proper alignment. Sealant, foam and membrane shall be<br />

installed where indicated without skips and voids to ensure weather tightness and integrity of the vapor<br />

barrier.<br />

3.3 HANDLING AND STORAGE<br />

A. The panels shall be handled and stored in accordance with good construction practice to prevent<br />

permanent distortion and mechanical damage.<br />

INSULATED-CORE METAL WALL PANELS 07413 - 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!