04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

for the temperature pulldown, and shall have supervision present during the pulldown to<br />

monitor the insulation envelope's performance during this critical period, and to take<br />

actions as necessary to prevent damage to the envelope due to the pull-down process.<br />

B. Any presence of frost at junctures, connection joints and intersections shall constitute<br />

unacceptable work and shall be corrected before final acceptance.<br />

END OF SECTION 13010<br />

GENERAL PROVISIONS - LOW TEMPERATURE INSULATION 13010-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!