04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

P. Remote Monitoring Components: Sensors, associated communication modules, and network interface<br />

units, matched to and compatible with electrical power monitoring and control network. Communication<br />

module shall have capability to transmit the following data to remote monitoring devices:<br />

1. System in alarm.<br />

2. Power factor set-point.<br />

3. Corrected power factor.<br />

4. Number of capacitor steps activated.<br />

2.6 FACTORY FINISH<br />

A. Manufacturer's standard enamel over corrosion-resistant treatment or primer coat.<br />

2.7 SOURCE QUALITY CONTROL<br />

A. Factory test power factor correction equipment before shipment. Comply with NEMA CP 1 “Shunt<br />

Capacitors”. Include the following:<br />

1. Routine capacitor production tests, including short-time overvoltage, capacitance, leak, and<br />

dissipation-factor tests.<br />

2. Functional test of all operations, controls, indicators, sensors, and protective devices.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install freestanding equipment on concrete bases<br />

B. Comply with mounting and anchoring requirements.<br />

C. Maintain minimum workspace according to manufacturer's written instructions.<br />

D. All current transformer current loops shall be connected through shorting-type terminal blocks.<br />

E. Identify components according to Division 16 Section "Electrical Identification."<br />

3.2 FIELD QUALITY CONTROL<br />

A. Prepare for acceptance tests as follows:<br />

1. Test insulation resistance for each power factor correction capacitor element, bus, component,<br />

connecting supply, feeder, and control circuit.<br />

2. Test continuity of each circuit.<br />

B. Manufacturer's Field Service: Engage a factory-authorized service representative to perform the following:<br />

POWER FACTOR CORRECTION CAPACITOR SYSTEMS 16450 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!