501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1.4 REFERENCE STANDARDS<br />

A. The site-specific Health and Safety Plan and all work conducted on-site shall be consistent with the<br />

requirements of the following references:<br />

1. Occupational Safety and Health Administration Standards and Regulations contained in<br />

Title 29, Code of Federal Regulations, Parts 1910 and 1926 (29 CFR 1910 and 1926), including<br />

amendments as stated in the Federal Register.<br />

2. United States Environmental Protection Agency (EPA) Standard Operating Guidelines, latest<br />

revision.<br />

3. All applicable Airport Authority policies and procedures including emergency response<br />

procedures.<br />

4. FedEx Contractor Safety Requirements (Appendix D to this Project Manual).<br />

1.5 RESPONSIBILITY OF THE CONTRACTOR<br />

A. Minimum precautions noted in this Section shall in no way relieve the Contractor of his/her<br />

responsibility to implement stricter health and safety precautions as warranted by the work.<br />

B. All work performed under this contract shall be in compliance with OSHA 29 CFR 1926 and 1910<br />

regulations and any other applicable federal, state or local health and safety regulations.<br />

C. The Contractor's SSHO shall conduct an initial survey to determine the appropriate safety procedures<br />

and level of worker safety equipment. The Contractor's SSHO shall maintain a continuous hazardous<br />

materials health and safety monitoring program throughout the performance of the work. It shall be the<br />

SSHO's responsibility to notify the <strong>Construction</strong> Manager of any deviations in the health and safety<br />

monitoring program.<br />

D. It shall be the Contractor's responsibility to notify the <strong>Construction</strong> Manager verbally and in writing as<br />

quickly as possible should any unforeseen safety hazard or condition become evident during the<br />

performance of the work. In the interim, the Contractor shall take prudent action to establish and<br />

maintain safe working conditions and to safeguard workers, on-site personnel, visitors, and the<br />

environment in accordance with the established emergency response procedures detailed in the<br />

Contractor's HASP.<br />

1.6 EMPLOYEE TRAINING<br />

A. It will be the Contractor's responsibility to train its employees. The Contractor shall be responsible for<br />

ensuring that only personnel having successfully completed the required H&S training are permitted to<br />

enter designated areas of the site where worker protection is required.<br />

B. At least one individual (SSHO) as designated by the Contractor, who has current certification (Red<br />

Cross or equivalent) in basic first aid and cardiopulmonary resuscitation (CPR) must be present on the<br />

site at all times. This individual must also have received training and information regarding OSHA's<br />

HEALTH AND SAFETY PLAN 01550 - 2