04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

C. Grade surface to match adjacent grades and to provide flow of surface drainage after fill placement and compaction.<br />

3.5 DISPOSAL OF DEMOLISHED MATERIALS<br />

A. Comply with the City of Oakland regulations by preparing and enacting a Waste Reduction and Recycling Plan<br />

(WRRP). For more information, reference http://oaklandrecycles.com/page.<br />

B. Remove from site debris, rubbish, and other materials resulting from demolition operations. Leave areas of work in<br />

clean condition.<br />

C. No burning of any material, debris, or trash on-site or off-site will be allowed except when allowed by appropriate<br />

governing authority and Owner. If allowed as stated above, burning shall be performed in manner prescribed by<br />

governing authority. Attend burning materials until fires have burned out and have been completely extinguished.<br />

D. Transport materials removed from demolished structures with appropriate vehicles and dispose off-site to areas<br />

that are approved for disposal by governing authorities and appropriate property owners.<br />

PART 4 – MEASUREMENT AND PAYMENT<br />

A. Measurement and payment shall be based on the units listed on the Bid Form and shall include full compensation<br />

for furnishing all materials, all preparation, assembly, and installation of these materials, and for all labor, equipment,<br />

tools, and incidentals necessary to complete each item.<br />

END OF SECTION<br />

SITE DEMOLITION 02220 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!